Local Agency Program Recovery (LAP-R) |
Kaley Road Resurfacing Project
This project entails milling and resurfacing all existing travel lanes from East of Division Street to the west side of Pine Bluff Avenue (Mill 2.5 inches of asphalt in section west of Orange Avenue, and mill 1 inch of asphalt in section east of Orange Avenue). Manhole and valve lids will be adjusted as necessary to match the new pavement. Sidewalk crossings at driveways and curb ramps will be reconstructed as necessary to meet ADA criteria. The length of the project is approximately 6,917 feet (1.310 miles) long.