Transportation Project

Local Agency Program Recovery (LAP-R) | Harrell Road Bridge Improvement Project

The project consists of the roadway widening at the existing Harrell Road Bridge over Little Econlockhatchee River and adding prefabricated pedestrian bridge (169.3 LF) to be constructed adjacent to the existing bridge. The project is located between S.R. 50 and Trevarthon Road. The net length of the project is 741 linear feet and includes the construction of storm water piping and associated structures, Type F curb and gutter, concrete sidewalks with ADA ramps and driveway aprons.

Project Details
Project Contact Government Information
407-836-3111
* Project Funding Recap
Grant Amount for Project  $642,520.00
[+] Matching Funds $0.00
[+] External Funds $0.00
[=] Project Cost $642,520.00
Expenditures to Date  $70,505.84
Annual Expenditures
$70,505.84
*Project Cost is calculated through end of the previous business day. Expenditures to Date may not include all expended Matching Funds until after the end of the fiscal year. External funds do not flow through the Orange County financial system and are not represented in Expenditures to Date nor Annual Expenditures.
Federal Agency Dept. of Transportation
Grant Type Competitive
Passed through the State? Yes
Application Date 2/25/2009
BCC Approval Date 8/25/2009
Jobs Created / Retained Federal Job Creation Formula indicates 25 jobs will be created with this project.
Comments
Project Schedule: Design Completion - Completed. Bid Package Submitted to FDOT - 10/19/2009. Anticipated FDOT NTP Date - 10/28/2009. Anticipated Advertisement Date - 11/18/2009. Anticipated Bid Opening Date (30 days advertised) - 12/10/2009. Anticipated Award Date - 03/02/2010. Anticipated contract execution - 04/01/2010. Anticipated Pre-Construction Meeting - 04/08/2010. Anticipated NTP to Contractor date - 04/12/2010. Construction days - 210. Anticipated Completion Date - 11/08/2010. Anticipated Final Acceptance Date - 01/07/2011.