Local Agency Program Recovery (LAP-R) |
Campo Way Bridge Improvement Project
The project consists of replacing an existing Campo Way Bridge located over the Little Wekiva River (LW-9 Canal) with four (4) - 10’x 8’ concrete box culverts consisting of two 12-foot travel lanes. The net length of this project is 247 feet and includes concrete sidewalks, driveways, guardrails, and pedestrian handrails.