Local Agency Program Recovery (LAP-R) |
Taylor Creek Road Bridge Replacement Project
This project entails the replacement of the existing wooden bridge with a three-span structure utilizing precast, pre-stressed concrete beams with a cast-in-place deck. The substructure will consist of precast concrete pilings. The improvement will also include guardrail, retaining walls, drainage structures, concrete traffic railing barrier, driveways, sod and construction of a single travel lane in each direction. The project is 1,050 feet in length.