Dean Road Resurfacing Project
This project entails milling and resurfacing 2.5 inches of asphalt from all existing travel lanes from North of State Road 50 (Colonial Drive) to the south side of University Boulevard. Manhole and valve lids will be adjusted as necessary to match the new pavement. Sidewalk crossings at driveways and curb ramps will be reconstructed as necessary to meet ADA criteria. Roadside shoulders will be re-graded as necessary to meet vehicle drop-off criteria. The length of the project is approximately 9,842 feet (1.864 miles) long.